Skip to main content
Teacher Portal

Teacher Toolbox icon Teacher Toolbox - Facilitating the Build

In this Seek section, groups will add sensors to their Workcell build.

What the Teacher Will Do:

  • Tell students get into their groups with their assigned Workcells.
  • Instruct groups to follow the Build Instructions linked on this page.
  • As groups are building, circle the room and assist as needed.

Go to the V5 Workcell Educator Certification for additional suggestions on facilitating the build.

Materials Required:
Quantity Materials Needed
1 per group

V5 Workcell

1 per group

VEXcode V5

1 per group

Engineering Notebook

1 per group

Device to run VEXcode V5

1 per group

Micro-USB cable

1 per group

Seek Checklist (Google / .docx / .pdf)

Select the button below for the VEX V5 Workcell Lab 10 Build Instructions.

Lab 10 Build

Build Instructions

Teacher Tips icon Teacher Tips

  • Use the open ended wrench to hold the nylock nut in place while screwing in the star drive screw.
  • As students add additional cables to their Workcell, encourage students to think about cable management. Students can:

    • Use zip ties to attach cables to the bottom of the base plate on the Workcell.
    • Use zip ties or tape to hold groups of cables together.

For more tips and guidance while building, go to the V5 Workcell Educator Certification.