Skip to main content
Teacher Portal

Tallest Tower Checklist

  • Seek

    • The Completed Look of the Build

    • Parts Needed

    • Build Instructions

    • Exploration

  • Play

    • 15-Minute Tower Build

    • Reinforcing or Bracing Structures

    • Iterative Design

    • Round 2: Improve Your Design

  • Apply

    • How Skyscrapers Are Made

    • San Francisco and Seismic Isolators

    • Designing Stable Robots for Competitions

  • Rethink

    • Prepare for the Tower Strength Challenge

    • Tower Strength Challenge

    • Improve and Tinker with Your Build

  • Know

    • Review

  • Appendix

    • Brain LED Status

    • Brain Overview

    • Disconnecting a Smart Device

    • Identifying Angle Beams

    • Installing a Robot Battery

    • Installing Rubber Shaft Collars

    • Navigating the Device Information Menu

    • Removing a Robot Battery

    • Robot Battery Charging and Usage

    • Removing Connectors from Beams and Plates

    • Removing Pins from VEX IQ Beams and Plates

    • Removing Standoffs from Mini Standoff Connectors

    • Supporting Shafts using Rubber Shaft Collars

    • Supporting Shafts using Shaft Bushings