Skip to main content
Teacher Portal

Build Instructions

Teacher Toolbox icon Teacher Toolbox - Facilitating the Build

In this Seek section, groups will add the Disk Feeder to their Workcell build.

What the Teacher Will Do:

  • Tell students get into their groups with their assigned Workcells.
  • Instruct groups to follow the Build Instructions linked on this page.
  • As groups are building, circle the room and assist as needed.

Go to the V5 Workcell Educator Certification for additional suggestions on facilitating the build.

Materials Required:
Quantity Materials Needed
1 per group

V5 Workcell

1 per group

VEXcode V5

1 per group

Engineering Notebook

1 per group

Device to run VEXcode V5

1 per group

Micro-USB cable

1 per group

Seek Checklist (Google / .docx / .pdf)

Select the button below for the Disk Feeder and Cooperative Systems Build Instructions.

Lab 11 cell build

Build Instructions (one system)

For using multiple systems, select the buttons below for the multi-system Disk Feeder and Cooperative Systems Build Instructions.

Lab 11 Build

Build Instructions (two systems)

3 cell image

Build Instructions (three systems)

Teacher Tips icon Teacher Tips

  • Use the open ended wrench to hold the nylock nut in place while screwing in the star drive screw.
  • Ensure to remove the V5 Smart Cable from the Optical Sensor before detaching it from the Workcell. 

For more tips and guidance while building, go to the V5 Workcell Educator Certification.